Process

Everything you need to know about the stages and process for a building project.

Rachel Moses Architect Ltd - working on drawings

1. Preparation

  • I will meet you and visit the site to develop a brief from the information you provide.

  • I will also carry out a measured survey of your property.

Construction site

4. Construction

  • I will administer the contract on site and make site visits (one per month minimum) up to practical completion.

Rachel Moses Architect Ltd - listed building specialist - working on drawings

2. Design

  • I will produce sketch designs and ideas and present them to you.

  • I will then produce a set of survey drawings and a set of proposed drawings of the chosen design and present these to you.

  • I will produce a Design and Access statement if required. I will also prepare the planning and listed building application and submit it to your local council. The planners take 8 weeks minimum to determine an application once registered.

Rachel Moses Architect Ltd - Example of interior of kitchen - kitchen extension

5. Use

  • I will visit the site six months after project is complete, and will write a snagging list and prepare the final certificate.

Rachel Moses Architect Ltd - working drawings

3. Pre-construction

  • I will design and produce a full set of working drawings with specification. I will also prepare the building regulation application and submit it to building control. Building control take 4 weeks minimum to determine an application once registered.

  • I will then prepare a set of tender documents.

  • I will send the project out to tender to 3 building contractors for a fixed price contract. The builders require 4 weeks to prepare a tender price.

  • Following this, I will prepare the contract documents. This is usually the JCT minor building works contract.